Forest Green Estates
Tentative Start: May 15th*
Contact: Jonathan Haarman
Mobile: (636) 248-0638
Leritz Busy Bee paving is pleased to announce that we have been awarded the street resurfacing project on your subdivision street. This notice is to inform you of the scope of work and projected time frame, so you have the opportunity to plan accordingly.
Our work includes roto-milling the entire subdivision street down 2 inches, pavement cleaning, application of a tack coat or adhesive, and placing a new asphalt surface over the existing roadway.
The major scope of work (including roto-milling and paving) will be performed over ten days, tentatively beginning on Wednesday, May 15th, weather permitting.
Tentative Schedule
Days 1-4: Roto-Milling
- Work occurring on asphalt & large curbs
- Large construction trucks & equipment present
- Street will remain open to local traffic
- Please expect some traffic delays
Days 5-10: Paving (Red Zone)
- Work will occur from 7:00 am - 5:00 pm
- Entire Street closed to main traffic
- Paving will occur on the main drive of the street
- Work will start from the back and move to the front
- Prepare for delays if leaving residence after 7:00 am
- Street will be open after 5:00 pm, or when work is completed
- After paving is complete, we will install curbing & backing
- Large construction trucks & equipment present
- Street will remain open to local traffic
Phase One: Blue Zone (Completed 5/24)
Phase Two: Red Zone (Completed 5/28)
Base Repair, Streets Open (Completed 5/29)
Phase Three: Green Zone (Completed 5/30)
Phase Four: Yellow Zone (Completed 5/31)
Copper Hill & Northbridge Base Repairs (Completed 6/03)
Phase Five: Purple Zone (Completed 6/04)
Milboro Base Repairs (Completed 6/05)
Phase Six: Teal Zone (Completed 6/06)
Notes
- We will place QR Code signs at neighborhood entrances. Please scan these codes for project weather updates
- Please be advised that we will apply a tack coat to the old surface to bond the new asphalt layer.
- This is a very sticky black substance that will stain your automobiles and driveways, particularly concrete driveways.
- Please do not drive through the tack coat and onto your driveways.

*We must have dry weather to perform this work. Rain or a threat of rain will cause us to postpone our work until the next weekday. Of course, if an emergency arises, we will stop our work and move out of the way for emergency vehicles.
To Help Plan Your Day, Here Are Some Reminders
Postpone Home Maintenance
Including Lawn Maintenance.
There will be no room for pickup trucks or trailers to maneuver.
Postpone Deliveries
Including Amazon, UPS, FedEx, appliances, furniture, etc., for the same reasons listed previously.
Do Not Run Sprinkles
Specifically on the days our crews are working. We cannot pave a wet street.
Do Not Let Pets Run Loose
They can burn their paws on the hot asphalt or get black goo on their paws and track it into your home.
Mark Exterior Systems
Including sprinkler systems, dog fences, and other items; they are the homeowner's responsibility.
Thank you for your confidence in our company. At Leritz Busy Bee, we know all things asphalt and paving. Our expert team is ready to work with you on new pavement projects, asphalt maintenance, & municipal asphalt projects. We're here to help!